Centerprise International (Distribution) is an operational data center operated by Centerprise International in Hengoed, United Kingdom. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Centerprise International |
| Address | Alder Avenue 9, CF82 7TW, Hengoed |
| Coordinates | 51.62933, -3.22900 |
| Website | centerprise.co.uk/contact-us |
Power and grid
| Nearest high-voltage substation | Energlyn Grid Substation, 132 kV, 4.2 km away (National Grid Electricity Distribution Plc) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Cilfynydd Supergrid Substation, 400 kV, 5 km away |
| HV substations within 10 km | 6 |
| Power plants within 50 km | 3.7 GW in 125 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 30.8 °C (2001 to 2025) |
| Cooling degree days | 12 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.4 m/s average |
| Water stress today | Low (<10%) (Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Centerprise International (Distribution) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Energlyn Grid Substation (132 kV), about 4.2 km away.
How clean is the power for Centerprise International (Distribution)?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Centerprise International (Distribution)?
Centerprise International.
Data centers near Hengoed
- Vantage Data Centers - CWL1 15.6 km · 17 MW
- Microsoft Newport data centre 15.7 km · 25 MW
- Vantage Data Centers - CWL13 15.9 km · 6.1 MW
- BT Empire Exchange / Stadium House 17.1 km
- Keppel Data Centres | Cardiff Data Centre 19.9 km
- CGI Datacenter 28.7 km · 3 MW
- Insight Data Ltd 37.4 km
- nLighten Bristol 45.8 km · 7.4 MW