Vantage Data Centers - CWL13
Vantage Data Centers - CWL13 is an operational data center operated by Vantage Data Centers in Newport, United Kingdom. Our footprint estimate of its power is about 6.1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Vantage Data Centers |
| Facility power | 6.1 MW (range 2.5 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 51,065 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | North Lake Drive, NP10 8DE, Newport |
| Coordinates | 51.55453, -3.03258 |
| Website | vantage-dc-cardiff.co.uk |
Power and grid
| Nearest high-voltage substation | Imperial Park Substation, 400 kV, 800 m away (National Grid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 13 |
| Power plants within 50 km | 3.8 GW in 137 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 30.8 °C (2001 to 2025) |
| Cooling degree days | 12 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.4 m/s average |
| Water stress today | Low (<10%) (Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Vantage Data Centers - CWL13 use?
We estimate the facility power at about 6.1 MW. Estimate from building footprint, low confidence.
How close is Vantage Data Centers - CWL13 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Imperial Park Substation (400 kV), about 800 m away.
How clean is the power for Vantage Data Centers - CWL13?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Vantage Data Centers - CWL13?
Vantage Data Centers.
Data centers near Newport
- Vantage Data Centers - CWL1 326 m · 17 MW
- Microsoft Newport data centre 673 m · 25 MW
- BT Empire Exchange / Stadium House 13.3 km
- Keppel Data Centres | Cardiff Data Centre 15.6 km
- Centerprise International (Distribution) 15.9 km
- Insight Data Ltd 23.4 km
- nLighten Bristol 31.2 km · 7.4 MW
- nLighten Bristol BRS1 31.4 km
More Vantage Data Centers data centers
- Vantage TX1 United States
- Vantage VA2 United States
- Vantage Data Center FRA21 Germany
- Vantage VA3 United States
- Vantage VA13 United States
- Vantage San Antonio II United States
- Vantage Data Centers - CWL1 United Kingdom
- Vantage Data Centers AZ1 Campus United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.