Vantage San Antonio II
Vantage San Antonio II is an operational data center operated by Vantage Data Centers in Leon Valley, United States. Our footprint estimate of its power is about 18 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Vantage Data Centers |
| Facility power | 18 MW (range 7.4 MW to 46 MW) Estimate from building footprint, low confidence. Footprint estimate: about 153,712 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 7,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Vantage Data Centers TX21 · Vantage Data Centers TX22 |
| Coordinates | 29.47791, -98.69789 |
Power and grid
| Nearest high-voltage substation | Westover Hills Substation, 138 kV, 500 m away (CPS Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Cagnon Road Substation, 345 kV, 7.1 km away |
| HV substations within 10 km | 15 |
| Utility | City Of San Antonio (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ERCO |
| Nearest gas pipeline | El Paso Texas Pipeline Co, intrastate pipeline, 4.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.2 GW in 24 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.5 °C (2001 to 2025) |
| Cooling degree days | 1,804 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.84 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Vantage San Antonio II use?
We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.
How close is Vantage San Antonio II to the power grid?
The nearest high-voltage substation in OpenStreetMap is Westover Hills Substation (138 kV), about 500 m away. The local utility is City Of San Antonio, in the ERCO balancing area.
How clean is the power for Vantage San Antonio II?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates Vantage San Antonio II?
Vantage Data Centers.
Data centers near Leon Valley
- Microsoft 372 m · 26 MW
- Microsoft San Antonio 563 m · 90 MW
- Microsoft 698 m · 37 MW
- Microsoft 860 m · 74 MW
- Lowe's Data Center 978 m · 11 MW
- Frost Bank data center in Leon Valley 1.3 km · 11 MW
- CHRISTUS Health data center in Leon Valley 1.4 km · 8.9 MW
- CyrusOne San Antonio 1.6 km · 4.7 MW
More Vantage Data Centers data centers
- Vantage TX1 United States
- Vantage VA2 United States
- Vantage Data Center FRA21 Germany
- Vantage VA3 United States
- Vantage VA13 United States
- Vantage Data Centers - CWL1 United Kingdom
- Vantage Data Centers AZ1 Campus United States
- Vantage Santa Clara CA2 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.