Microsoft
Microsoft is an operational data center operated by Microsoft in San Antonio, United States. Our footprint estimate of its power is about 26 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 26 MW (range 13 MW to 41 MW) Estimate from building footprint, low confidence. Footprint estimate: about 21,395 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 11,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Rogers Road 5200, 78251, San Antonio |
| Coordinates | 29.48105, -98.69657 |
Power and grid
| Utility | City Of San Antonio (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | El Paso Texas Pipeline Co, intrastate pipeline, 5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.5 °C (2001 to 2025) |
| Cooling degree days | 1,804 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.84 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft use?
We estimate the facility power at about 26 MW. Estimate from building footprint, low confidence.
What chips does Microsoft use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How clean is the power for Microsoft?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates Microsoft?
Microsoft.
Data centers near San Antonio
- Vantage San Antonio II 372 m · 18 MW
- Microsoft San Antonio 412 m · 90 MW
- Microsoft 648 m · 37 MW
- Lowe's Data Center 1.1 km · 11 MW
- Microsoft 1.2 km · 74 MW
- Frost Bank data center in Leon Valley 1.5 km · 11 MW
- CHRISTUS Health data center in Leon Valley 1.6 km · 8.9 MW
- Microsoft SAT14 1.6 km · 18 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.