Microsoft Project Osmium
Microsoft Project Osmium is an operational AI data center operated by Microsoft in Cumming, United States. Its power is about 228 MW. Epoch AI estimates about 156,000 H100-equivalent AI chips (A100, H100, B200).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Users | OpenAI (speculative) |
| Facility power | 228 MW Reported (Epoch AI or owner data) |
| IT power | 190 MW |
| AI compute | 156,000 H100-equivalents |
| AI chips | A100, H100, B200 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 110,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 7.2 billion Epoch AI estimate, 2025 USD. |
| Address | 5855 SW Kerry St, Cumming, IA 50061 |
| Coordinates | 41.48332, -93.76244 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2018-12-18 | 0 | 0 | Land clearing begins on the north part of the site |
| 2021-01-01 | 57 MW | 7,883 | Building 1 and 1st building on the site are operational. Foundation work begins on Building 2 |
| 2023-06-30 | 114 MW | 41,000 | Building 2 is operational. Estimated based on Microsoft H100 count 2023 |
| 2025-03-01 | 228 MW | 156,000 | Building 3-4 operational, no visible construction. |
| 2025-10-08 | 228 MW | 156,000 | Site already complete. |
| 2026-06-16 | 228 MW | 156,000 | No notable changes since October. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2021-01-01 | A100 | 25,000 | Estimate |
| 2023-06-30 | H100 | 32,680 | Estimate |
| 2025-03-01 | B200 | 45,455 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Project Osmium use?
Public data puts the facility power at about 228 MW. Reported (Epoch AI or owner data).
What chips does Microsoft Project Osmium use?
Reported chips: A100, H100, B200.
Who operates Microsoft Project Osmium?
Microsoft. Reported users: OpenAI.
Data centers near Cumming
- Microsoft 2.4 km · 21 MW
- Project Osmium 2.6 km · 75 MW
- Project Ginger East 5.0 km · 67 MW
- Project Alluvion 6.0 km · 56 MW
- Microsoft 6.3 km · 13 MW
- Project Mountain 8.3 km · 17 MW
- Project Ginger West 9.9 km · 72 MW
- Microsoft 10.2 km · 21 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
- Microsoft Grange Castle Ireland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.