Microsoft Grange Castle
Microsoft Grange Castle is an operational data center operated by Microsoft in Clondalkin, Ireland. Our footprint estimate of its power is about 111 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 111 MW (range 44 MW to 277 MW) Estimate from building footprint, low confidence. Footprint estimate: about 922,028 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 47,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Microsoft DUB07 · Microsoft DUB09 · Microsoft DUB10 · Microsoft DUB12 |
| Coordinates | 53.32252, -6.44716 |
Power and grid
| Nearest high-voltage substation | Corkagh 110kV Substation, 110 kV, 200 m away (EirGrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Castlebaggot 220kV Substation, 220 kV, 700 m away |
| HV substations within 10 km | 31 |
| Power plants within 50 km | 3.5 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 261 g CO₂ per kWh (Ireland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8% |
| Industrial power price | EUR 0.206 per kWh (Ireland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 24.3 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.74 kWh per m² per day |
| Wind at 50 m | 8 m/s average |
| Water stress today | Low (<10%) (Ireland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Grange Castle use?
We estimate the facility power at about 111 MW. Estimate from building footprint, low confidence.
What chips does Microsoft Grange Castle use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How close is Microsoft Grange Castle to the power grid?
The nearest high-voltage substation in OpenStreetMap is Corkagh 110kV Substation (110 kV), about 200 m away.
How clean is the power for Microsoft Grange Castle?
The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.
Who operates Microsoft Grange Castle?
Microsoft.
Data centers near Clondalkin
- Microsoft DUB14 276 m · 14 MW
- Digital Realty Dublin DUB3 285 m
- Microsoft DUB13 322 m · 12 MW
- Microsoft DUB06 486 m · 24 MW
- Data center in Clondalkin 528 m · 21 MW
- Microsoft DUB03 / DUB04 537 m · 65 MW
- Data center in Clondalkin 562 m
- Digital Realty Dublin DUB13-14 575 m · 4.1 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.