Microsoft Grange Castle

Microsoft Grange Castle is an operational data center operated by Microsoft in Clondalkin, Ireland. Our footprint estimate of its power is about 111 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power111 MW (range 44 MW to 277 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 922,028 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 47,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asMicrosoft DUB07 · Microsoft DUB09 · Microsoft DUB10 · Microsoft DUB12
Coordinates53.32252, -6.44716

Power and grid

Nearest high-voltage substationCorkagh 110kV Substation, 110 kV, 200 m away (EirGrid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationCastlebaggot 220kV Substation, 220 kV, 700 m away
HV substations within 10 km31
Power plants within 50 km3.5 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity261 g CO₂ per kWh (Ireland, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8%
Industrial power priceEUR 0.206 per kWh (Ireland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature24.3 °C (2001 to 2025)
Cooling degree days1 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.74 kWh per m² per day
Wind at 50 m8 m/s average
Water stress todayLow (<10%) (Ireland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Microsoft Grange Castle use?

We estimate the facility power at about 111 MW. Estimate from building footprint, low confidence.

What chips does Microsoft Grange Castle use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How close is Microsoft Grange Castle to the power grid?

The nearest high-voltage substation in OpenStreetMap is Corkagh 110kV Substation (110 kV), about 200 m away.

How clean is the power for Microsoft Grange Castle?

The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.

Who operates Microsoft Grange Castle?

Microsoft.

Data centers near Clondalkin

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.