Microsoft Fairwater Wisconsin
Microsoft Fairwater Wisconsin is an operational data center that is still expanding, operated by Microsoft in Mount Pleasant, United States. Its power is about 442 MW, growing to about 2.7 GW by 2028-05. Epoch AI estimates about 446,000 H100-equivalent AI chips (B200).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | Microsoft |
| Users | OpenAI (likely), Microsoft (likely) |
| Project | Microsoft AI WAN |
| Facility power | 442 MW Reported (Epoch AI or owner data) |
| IT power | 369 MW |
| Planned power | 2.7 GW by 2028-05-13 Epoch AI timeline projection. |
| AI compute | 446,000 H100-equivalents → 4.5 million planned |
| AI chips | B200 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 210,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 14.0 billion → 85.7 billion planned Epoch AI estimate, 2025 USD. |
| Energy partners | WE Energies |
| Address | 4800 90th St, Mount Pleasant, WI 53403 |
| Coordinates | 42.67487, -87.89488 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2023-07-14 | 0 | 0 | Land clearing begins for Building 1. |
| 2025-09-26 | 0 | 0 | Building 1 cooling and backup generators all look complete from above but there is still construction visible around the building. Building 2 is well underway with a foundation and a complete substation. Large carpark and concrete area north of Building 2. Building 3 has a concrete foundation and a substation underway. |
| 2026-01-28 | 0 | 0 | Building 1 looks complete, but based on Microsoft announcements, it's not fully operational yet. Steel framing is underway for Building 2. |
| 2026-04-16 | 442 MW | 446,000 | Building 1 is operational. [X post](https://x.com/satyanadella/status/2044767391293509761?s=61) from Microsoft saying this date for Fairwater becoming operational. |
| 2026-05-15 | 442 MW | 446,000 | The main shell of Building 2 looks almost completed. In Area 2 (northwest of Buildings 1-2), the grading for the original design has been replaced with grading for the new [9-building design](https://www.mtpleasantwi.gov/AgendaCenter/ViewFile/Agenda/_01212026-1292), making way for Buildings 3-11. Work continues on the northern substation in Area 2. |
| 2027-02-20 (projected) | 885 MW | 889,000 | Building 2 is operational. This is estimated based on (1) the delay between Building 1 and Building 2 starting land clearing, (2) in March 2025, a Microsoft spokesperson [said](https://www.wpr.org/news/microsoft-pauses-construction-on-parts-of-mount-pleasant-site-again) “fully on track” with the first phase , where “southern datacenter buildings complete, and preparation begins for operations” was [expected](https://local.microsoft.com/blog/mount-pleasant-datacenter-project-update/) by late 2026. Finally, while it's not 100% consistent with our estimates, MISO was [planning](https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf) 1480 MW of load for Microsoft in Mount Pleasant in 2026. |
| 2028-05-13 (projected) | 2.7 GW | 4.5 million | Buildings 3-11 are estimated to be operational. The grading for this revised 9-building plan was underway in May 2026, and we assume an average 2-year [build time](https://epoch.ai/data-insights/data-centers-buildout-speeds) from that point. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-04-16 | B200 | 176,391 | Estimate |
| 2027-02-20 | B200 | 352,782 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Fairwater Wisconsin use?
Public data puts the facility power at about 442 MW, with about 2.7 GW planned by 2028. Reported (Epoch AI or owner data).
What chips does Microsoft Fairwater Wisconsin use?
Reported chips: B200.
Who operates Microsoft Fairwater Wisconsin?
Microsoft. Reported users: OpenAI, Microsoft.
Data centers near Mount Pleasant
- Data center in Sturtevant 236 m · 27 MW
- Microsoft Fairwater AI Datacenter 455 m · 123 MW
- Microsoft Fairwater AI Phase 2 1.3 km · 105 MW
- Data center in Sturtevant 1.9 km · 1 MW
- Microsoft Fairwater Phase 2 3.6 km · 316 MW
- CyberLynk MKE1 22.0 km
- Expedient Milwaukee 22.0 km · 2.7 MW
- TierPoint Milwaukee 37.6 km
More Microsoft data centers
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
- Microsoft Grange Castle Ireland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.