Data center in Sturtevant
Data center in Sturtevant is an operational data center in Sturtevant, United States. Our footprint estimate of its power is about 1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1 MW (range 0.5 MW to 1.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 815 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 430 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 42.67567, -87.91841 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 400 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 345 kV, 600 m away |
| HV substations within 10 km | 9 |
| Utility | Wisconsin Electric Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | ANR Pipeline Co, interstate pipeline, 4.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.4 GW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 530 g CO₂ per kWh (Wisconsin, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 35.3%, coal 34.8%, nuclear 15.2%, solar 6.6%, hydro 3.3%. Clean power: 29.8% |
| Industrial power price | USD 0.109 per kWh (Wisconsin, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.8 °C (2001 to 2025) |
| Cooling degree days | 389 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Medium - High (20-40%) (Wisconsin) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Sturtevant use?
We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.
How close is Data center in Sturtevant to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 400 m away. The local utility is Wisconsin Electric Power Co, in the MISO balancing area.
How clean is the power for Data center in Sturtevant?
The grid in Wisconsin emits about 530 g CO₂ per kWh (2025). Largest sources: gas 35.3%, coal 34.8%, nuclear 15.2%.
Data centers near Sturtevant
- Microsoft Fairwater AI Phase 2 666 m · 105 MW
- Microsoft Fairwater AI Datacenter 1.5 km · 123 MW
- Data center in Sturtevant 1.8 km · 27 MW
- Microsoft Fairwater Wisconsin 1.9 km · 442 MW
- Microsoft Fairwater Phase 2 2.1 km · 316 MW
- CyberLynk MKE1 21.4 km
- Expedient Milwaukee 21.4 km · 2.7 MW
- TierPoint Milwaukee 37.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.