Microsoft Fairwater AI Datacenter
Microsoft Fairwater AI Datacenter is an operational data center in Sturtevant, United States. Our footprint estimate of its power is about 123 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 123 MW (range 49 MW to 308 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,025,740 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 53,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Opened | April 2026 |
| Coordinates | 42.67630, -87.90010 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 400 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Mount Pleasant Substation, 345 kV, 1 km away |
| HV substations within 10 km | 9 |
| Utility | Wisconsin Electric Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | ANR Pipeline Co, interstate pipeline, 4.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.4 GW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 530 g CO₂ per kWh (Wisconsin, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 35.3%, coal 34.8%, nuclear 15.2%, solar 6.6%, hydro 3.3%. Clean power: 29.8% |
| Industrial power price | USD 0.109 per kWh (Wisconsin, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.8 °C (2001 to 2025) |
| Cooling degree days | 389 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Medium - High (20-40%) (Wisconsin) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Fairwater AI Datacenter use?
We estimate the facility power at about 123 MW. Estimate from building footprint, low confidence.
What chips does Microsoft Fairwater AI Datacenter use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How close is Microsoft Fairwater AI Datacenter to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 400 m away. The local utility is Wisconsin Electric Power Co, in the MISO balancing area.
How clean is the power for Microsoft Fairwater AI Datacenter?
The grid in Wisconsin emits about 530 g CO₂ per kWh (2025). Largest sources: gas 35.3%, coal 34.8%, nuclear 15.2%.
Data centers near Sturtevant
- Data center in Sturtevant 425 m · 27 MW
- Microsoft Fairwater Wisconsin 455 m · 442 MW
- Microsoft Fairwater AI Phase 2 838 m · 105 MW
- Data center in Sturtevant 1.5 km · 1 MW
- Microsoft Fairwater Phase 2 3.2 km · 316 MW
- CyberLynk MKE1 21.7 km
- Expedient Milwaukee 21.7 km · 2.7 MW
- TierPoint Milwaukee 37.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.