Data Center Directory

Microsoft Fairwater AI Datacenter

Microsoft Fairwater AI Datacenter is an operational data center in Sturtevant, United States. Our footprint estimate of its power is about 123 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
Facility power123 MW (range 49 MW to 308 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,025,740 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 53,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
OpenedApril 2026
Coordinates42.67630, -87.90010

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 400 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationMount Pleasant Substation, 345 kV, 1 km away
HV substations within 10 km9
UtilityWisconsin Electric Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Nearest gas pipelineANR Pipeline Co, interstate pipeline, 4.4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.4 GW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity530 g CO₂ per kWh (Wisconsin, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 35.3%, coal 34.8%, nuclear 15.2%, solar 6.6%, hydro 3.3%. Clean power: 29.8%
Industrial power priceUSD 0.109 per kWh (Wisconsin, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature8.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.8 °C (2001 to 2025)
Cooling degree days389 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.67 kWh per m² per day
Wind at 50 m7 m/s average
Water stress todayMedium - High (20-40%) (Wisconsin)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Microsoft Fairwater AI Datacenter use?

We estimate the facility power at about 123 MW. Estimate from building footprint, low confidence.

What chips does Microsoft Fairwater AI Datacenter use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How close is Microsoft Fairwater AI Datacenter to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 400 m away. The local utility is Wisconsin Electric Power Co, in the MISO balancing area.

How clean is the power for Microsoft Fairwater AI Datacenter?

The grid in Wisconsin emits about 530 g CO₂ per kWh (2025). Largest sources: gas 35.3%, coal 34.8%, nuclear 15.2%.

Data centers near Sturtevant

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.