Microsoft Fairwater Phase 2
Microsoft Fairwater Phase 2 is an operational data center in Sturtevant, United States. Our footprint estimate of its power is about 316 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 316 MW (range 126 MW to 789 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,629,328 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 140,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 42.69118, -87.93341 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Fairwater Phase 2 use?
We estimate the facility power at about 316 MW. Estimate from building footprint, low confidence.
What chips does Microsoft Fairwater Phase 2 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
Data centers near Sturtevant
- Data center in Sturtevant 2.1 km · 1 MW
- Microsoft Fairwater AI Phase 2 2.5 km · 105 MW
- Microsoft Fairwater AI Datacenter 3.2 km · 123 MW
- Data center in Sturtevant 3.6 km · 27 MW
- Microsoft Fairwater Wisconsin 3.6 km · 442 MW
- CyberLynk MKE1 19.4 km
- Expedient Milwaukee 19.5 km · 2.7 MW
- TierPoint Milwaukee 35.4 km
Sources