Data center in Sturtevant
Data center in Sturtevant is an operational data center in Sturtevant, United States. Our footprint estimate of its power is about 27 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 27 MW (range 13 MW to 43 MW) Estimate from building footprint, low confidence. Footprint estimate: about 22,412 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 42.67332, -87.89685 |
Power and grid
| Utility | Wisconsin Electric Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Nearest gas pipeline | ANR Pipeline Co, interstate pipeline, 4.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 530 g CO₂ per kWh (Wisconsin, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 35.3%, coal 34.8%, nuclear 15.2%, solar 6.6%, hydro 3.3%. Clean power: 29.8% |
| Industrial power price | USD 0.109 per kWh (Wisconsin, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.8 °C (2001 to 2025) |
| Cooling degree days | 389 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Medium - High (20-40%) (Wisconsin) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Sturtevant use?
We estimate the facility power at about 27 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Sturtevant?
The grid in Wisconsin emits about 530 g CO₂ per kWh (2025). Largest sources: gas 35.3%, coal 34.8%, nuclear 15.2%.
Data centers near Sturtevant
- Microsoft Fairwater Wisconsin 236 m · 442 MW
- Microsoft Fairwater AI Datacenter 425 m · 123 MW
- Microsoft Fairwater AI Phase 2 1.2 km · 105 MW
- Data center in Sturtevant 1.8 km · 1 MW
- Microsoft Fairwater Phase 2 3.6 km · 316 MW
- CyberLynk MKE1 22.1 km
- Expedient Milwaukee 22.1 km · 2.7 MW
- TierPoint Milwaukee 37.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.