Expedient Milwaukee
Expedient Milwaukee is an operational data center in Franklin, United States. Our footprint estimate of its power is about 2.7 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.7 MW (range 1.3 MW to 4.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,227 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | West Ironwood Drive 4777, 53132, Franklin |
| Coordinates | 42.86314, -87.97788 |
| Website | expedient.com/data-centers/milwaukee |
Power and grid
| Utility | Wisconsin Electric Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Nearest gas pipeline | ANR Pipeline Co, interstate pipeline, 12.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 530 g CO₂ per kWh (Wisconsin, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 35.3%, coal 34.8%, nuclear 15.2%, solar 6.6%, hydro 3.3%. Clean power: 29.8% |
| Industrial power price | USD 0.109 per kWh (Wisconsin, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40 °C (2001 to 2025) |
| Cooling degree days | 352 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Medium - High (20-40%) (Wisconsin) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Expedient Milwaukee use?
We estimate the facility power at about 2.7 MW. Estimate from building footprint, low confidence.
How clean is the power for Expedient Milwaukee?
The grid in Wisconsin emits about 530 g CO₂ per kWh (2025). Largest sources: gas 35.3%, coal 34.8%, nuclear 15.2%.
Data centers near Franklin
- CyberLynk MKE1 429 m
- TierPoint Milwaukee 16.3 km
- Microsoft Fairwater Phase 2 19.5 km · 316 MW
- Data Holdings Milwaukee 20.2 km
- 324 E Wisconsin 20.4 km
- Vaultas 21.0 km
- Data center in Sturtevant 21.4 km · 1 MW
- Microsoft Fairwater AI Phase 2 21.5 km · 105 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.