Data Center Directory

Expedient Milwaukee

Expedient Milwaukee is an operational data center in Franklin, United States. Our footprint estimate of its power is about 2.7 MW.

Key facts

StatusOperational
Facility power2.7 MW (range 1.3 MW to 4.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,227 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressWest Ironwood Drive 4777, 53132, Franklin
Coordinates42.86314, -87.97788
Websiteexpedient.com/data-centers/milwaukee

Power and grid

UtilityWisconsin Electric Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Nearest gas pipelineANR Pipeline Co, interstate pipeline, 12.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity530 g CO₂ per kWh (Wisconsin, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 35.3%, coal 34.8%, nuclear 15.2%, solar 6.6%, hydro 3.3%. Clean power: 29.8%
Industrial power priceUSD 0.109 per kWh (Wisconsin, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature8.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40 °C (2001 to 2025)
Cooling degree days352 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.67 kWh per m² per day
Wind at 50 m7 m/s average
Water stress todayMedium - High (20-40%) (Wisconsin)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Expedient Milwaukee use?

We estimate the facility power at about 2.7 MW. Estimate from building footprint, low confidence.

How clean is the power for Expedient Milwaukee?

The grid in Wisconsin emits about 530 g CO₂ per kWh (2025). Largest sources: gas 35.3%, coal 34.8%, nuclear 15.2%.

Data centers near Franklin

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.