CyberLynk MKE1
CyberLynk MKE1 is an operational data center operated by Wisconsin CyberLynk Network in Franklin, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Wisconsin CyberLynk Network |
| Networks | 1 networks PeeringDB. |
| Address | 10125 S 52nd St |
| Coordinates | 42.86183, -87.98283 |
| Website | cyberlynk.net |
Power and grid
| Nearest high-voltage substation | Root River, 138 kV, 2.1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Oak Creek Station, 345 kV, 12.3 km away |
| HV substations within 10 km | 6 |
| Utility | Wisconsin Electric Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | ANR Pipeline Co, interstate pipeline, 12.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.6 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 530 g CO₂ per kWh (Wisconsin, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 35.3%, coal 34.8%, nuclear 15.2%, solar 6.6%, hydro 3.3%. Clean power: 29.8% |
| Industrial power price | USD 0.109 per kWh (Wisconsin, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40 °C (2001 to 2025) |
| Cooling degree days | 352 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Medium - High (20-40%) (Wisconsin) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is CyberLynk MKE1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Root River (138 kV), about 2.1 km away. The local utility is Wisconsin Electric Power Co, in the MISO balancing area.
How clean is the power for CyberLynk MKE1?
The grid in Wisconsin emits about 530 g CO₂ per kWh (2025). Largest sources: gas 35.3%, coal 34.8%, nuclear 15.2%.
Who operates CyberLynk MKE1?
Wisconsin CyberLynk Network.
Data centers near Franklin
- Expedient Milwaukee 429 m · 2.7 MW
- TierPoint Milwaukee 16.5 km
- Microsoft Fairwater Phase 2 19.4 km · 316 MW
- Data Holdings Milwaukee 20.4 km
- 324 E Wisconsin 20.6 km
- Vaultas 21.2 km
- Data center in Sturtevant 21.4 km · 1 MW
- Microsoft Fairwater AI Phase 2 21.4 km · 105 MW