Vaultas
Vaultas is an operational data center operated by Vaultas in Milwaukee, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Vaultas |
| Address | 1101 N Market Street |
| Coordinates | 43.04500, -87.91019 |
| Website | vaultas.com |
Power and grid
| Utility | Wisconsin Electric Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Nearest gas pipeline | ANR Pipeline Co, interstate pipeline, 18.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 530 g CO₂ per kWh (Wisconsin, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 35.3%, coal 34.8%, nuclear 15.2%, solar 6.6%, hydro 3.3%. Clean power: 29.8% |
| Industrial power price | USD 0.109 per kWh (Wisconsin, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40 °C (2001 to 2025) |
| Cooling degree days | 352 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Medium - High (20-40%) (Wisconsin) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Vaultas?
The grid in Wisconsin emits about 530 g CO₂ per kWh (2025). Largest sources: gas 35.3%, coal 34.8%, nuclear 15.2%.
Who operates Vaultas?
Vaultas.
Data centers near Milwaukee
- 324 E Wisconsin 716 m
- Data Holdings Milwaukee 3.6 km
- TierPoint Milwaukee 5.7 km
- Expedient Milwaukee 21.0 km · 2.7 MW
- CyberLynk MKE1 21.2 km
- Pewaukee Data Center 24.9 km · 10 MW
- Ethoplex Data Center 28.0 km
- OpenAI Stargate Wisconsin 38.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.