Microsoft CYS Datacenter
Microsoft CYS Datacenter is an operational data center operated by Microsoft in Cheyenne, United States. Our footprint estimate of its power is about 131 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 131 MW (range 52 MW to 326 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,087,516 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 56,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.12259, -104.90352 |
Power and grid
| Utility | Cheyenne Light Fuel & Power (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | WACM |
| Nearest gas pipeline | Wyoming Interstate PL Co, interstate pipeline, 5.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 145 g CO₂ per kWh (South Dakota, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 58%, hydro 22.3%, coal 9.3%, gas 8.5%, solar 2%. Clean power: 82.3% |
| Industrial power price | USD 0.094 per kWh (South Dakota, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.4 °C (2001 to 2025) |
| Cooling degree days | 304 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.57 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (South Dakota) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft CYS Datacenter use?
We estimate the facility power at about 131 MW. Estimate from building footprint, low confidence.
What chips does Microsoft CYS Datacenter use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How clean is the power for Microsoft CYS Datacenter?
The grid in South Dakota emits about 145 g CO₂ per kWh (2025). Largest sources: wind 58%, hydro 22.3%, coal 9.3%.
Who operates Microsoft CYS Datacenter?
Microsoft.
Data centers near Cheyenne
- Data center in Cheyenne 389 m · 19 MW
- Data center in Cheyenne 391 m · 5.8 MW
- Data center in Cheyenne 435 m · 14 MW
- Data center in Cheyenne 544 m · 3.2 MW
- Microsoft data center in Cheyenne 545 m · 5.3 MW
- CYS42 Datacenter 547 m · 6.1 MW
- MineOne Wyoming Data Center 774 m · 4.6 MW
- University Corporation for Atmospheric Research data center in Cheyenne 866 m · 6.4 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft Grange Castle Ireland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.