Microsoft Fairwater Atlanta

Microsoft Fairwater Atlanta is an operational AI data center operated by Microsoft in Fayetteville, United States. Its power is about 859 MW. Epoch AI estimates about 769,000 H100-equivalent AI chips (B200).

Key facts

StatusOperational
OperatorMicrosoft
UsersOpenAI (likely), Microsoft (likely)
ProjectMicrosoft AI WAN
Facility power859 MW
Reported (Epoch AI or owner data)
IT power636 MW
AI compute769,000 H100-equivalents
AI chipsB200
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 350,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 24.1 billion
Epoch AI estimate, 2025 USD.
Energy partnersGeorgia Power
Address1435 Hwy 54 W, Fayetteville, GA 30214
Coordinates33.44549, -84.52412

Build timeline

DatePowerH100eWhat the satellite images and filings show
2023-04-0900Land clearing begins for southern part (Building 1-2)
2025-10-14433 MW388,000Building 1 and 2 are [operational](https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/). Building 1 looked operational sooner, but the buildings [are paired](https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/) in the Fairwater design. The roof of Building 4 is almost complete, while mechanical equipment is still being installed.
2026-02-13433 MW388,000Building 4 roof is complete and all mechanical equipment appears to be installed. However, there is still a lot of construction activity around the building.
2026-05-15433 MW388,000Building 4 still has some equipment strewn around the perimeter, so we think it is still going through commissioning. Two new buildings at the campus have shells underway, but we don't know if Microsoft is the tenant for those.
2026-06-14859 MW769,000Building 3 and 4 are operational.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2025-10-14B200153,563Estimate
2026-06-14B200304,279Estimate

Satellite view

Questions

How much power does Microsoft Fairwater Atlanta use?

Public data puts the facility power at about 859 MW. Reported (Epoch AI or owner data).

What chips does Microsoft Fairwater Atlanta use?

Reported chips: B200.

Who operates Microsoft Fairwater Atlanta?

Microsoft. Reported users: OpenAI, Microsoft.