QTS
QTS is an operational data center operated by Quality Technology Services in Tyrone, United States. Our footprint estimate of its power is about 39 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Quality Technology Services |
| Facility power | 39 MW (range 20 MW to 63 MW) Estimate from building footprint, low confidence. Footprint estimate: about 32,867 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 17,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.46399, -84.52918 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does QTS use?
We estimate the facility power at about 39 MW. Estimate from building footprint, low confidence.
Who operates QTS?
Quality Technology Services.
Data centers near Tyrone
- QTS 545 m · 57 MW
- QTS 1.5 km · 31 MW
- QTS Atlanta-Fayetteville (ATL2) 1.8 km · 31 MW
- Microsoft Fairwater Atlanta 2.1 km · 859 MW
- Microsoft East Point Datacenter Campus 19.7 km · 36 MW
- Digital Realty Data Center 23.9 km · 23 MW
- Westlake Data Center 27.7 km · 14 MW
- Microsoft 28.7 km · 3.9 MW
More Quality Technology Services data centers
- QTS Richmond 1 United States
- QTS Piscataway Data Center United States
- QTS Richmond 2 Data Center United States
- QTS Richmond 3 Data Center United States
- QTS Ashburn 1 DC1 United States
- DC5 United States
- QTS United States
- QTS Ashburn-Shellhorn United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.