Microsoft East Point Datacenter Campus
Microsoft East Point Datacenter Campus is an operational data center operated by Microsoft in Union City, United States. Our footprint estimate of its power is about 36 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 36 MW (range 14 MW to 90 MW) Estimate from building footprint, low confidence. Footprint estimate: about 301,621 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 15,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Microsoft |
| Coordinates | 33.64104, -84.51751 |
| Website | local.microsoft.com/blog/east-point-datacenter-project-overview |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 2.9 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 3.1 km away |
| HV substations within 10 km | 20 |
| Utility | City Of East Point (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SOCO |
| Nearest gas pipeline | Southern Natural Gas Co, interstate pipeline, 1.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.7 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 352 g CO₂ per kWh (Georgia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6% |
| Industrial power price | USD 0.131 per kWh (Georgia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.4 °C (2001 to 2025) |
| Cooling degree days | 1,093 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.51 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Medium - High (20-40%) (Georgia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft East Point Datacenter Campus use?
We estimate the facility power at about 36 MW. Estimate from building footprint, low confidence.
What chips does Microsoft East Point Datacenter Campus use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How close is Microsoft East Point Datacenter Campus to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 2.9 km away. The local utility is City Of East Point, in the SOCO balancing area.
How clean is the power for Microsoft East Point Datacenter Campus?
The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.
Who operates Microsoft East Point Datacenter Campus?
Microsoft.
Data centers near Union City
- Digital Realty Data Center 9.6 km · 23 MW
- Westlake Data Center 9.8 km · 14 MW
- Microsoft 10.6 km · 3.9 MW
- Centersquare Atlanta (ATL1-A/B/C) 13.0 km · 36 MW
- Digital Realty Atlanta ATL11 13.1 km · 30 MW
- Douglasville 2 13.2 km · 65 MW
- Cogent Atlanta 2 13.3 km
- EdgeConneX Atlanta (EDCATL02) 13.3 km
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.