Data Center Directory

Microsoft East Point Datacenter Campus

Microsoft East Point Datacenter Campus is an operational data center operated by Microsoft in Union City, United States. Our footprint estimate of its power is about 36 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power36 MW (range 14 MW to 90 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 301,621 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 15,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asMicrosoft
Coordinates33.64104, -84.51751
Websitelocal.microsoft.com/blog/east-point-datacenter-project-overview

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 2.9 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 230 kV, 3.1 km away
HV substations within 10 km20
UtilityCity Of East Point (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authoritySOCO
Nearest gas pipelineSouthern Natural Gas Co, interstate pipeline, 1.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.7 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity352 g CO₂ per kWh (Georgia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6%
Industrial power priceUSD 0.131 per kWh (Georgia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.4 °C (2001 to 2025)
Cooling degree days1,093 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.51 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayMedium - High (20-40%) (Georgia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Microsoft East Point Datacenter Campus use?

We estimate the facility power at about 36 MW. Estimate from building footprint, low confidence.

What chips does Microsoft East Point Datacenter Campus use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How close is Microsoft East Point Datacenter Campus to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 2.9 km away. The local utility is City Of East Point, in the SOCO balancing area.

How clean is the power for Microsoft East Point Datacenter Campus?

The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.

Who operates Microsoft East Point Datacenter Campus?

Microsoft.

Data centers near Union City

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.