Westlake Data Center
Westlake Data Center is a data center under construction operated by Vantage Data Centers in Mableton, United States. Our footprint estimate of its power is about 14 MW.
Key facts
| Status | Under construction |
|---|---|
| Operator | Vantage Data Centers |
| Facility power | 14 MW (range 5.4 MW to 34 MW) Estimate from building footprint, low confidence. Footprint estimate: about 113,106 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.70924, -84.58418 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 1.4 km away (Georgia Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 22 |
| Utility | Greystone Power Corporation (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SOCO |
| Nearest gas pipeline | Southern Natural Gas Co, interstate pipeline, 4.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.7 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 352 g CO₂ per kWh (Georgia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6% |
| Industrial power price | USD 0.131 per kWh (Georgia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.4 °C (2001 to 2025) |
| Cooling degree days | 1,093 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.51 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Medium - High (20-40%) (Georgia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Westlake Data Center use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
How close is Westlake Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 1.4 km away. The local utility is Greystone Power Corporation, in the SOCO balancing area.
How clean is the power for Westlake Data Center?
The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.
Who operates Westlake Data Center?
Vantage Data Centers.
Data centers near Mableton
- Microsoft 999 m · 3.9 MW
- Douglasville 2 3.5 km · 65 MW
- Aligned Data Centers 3.8 km · 50 MW
- Flexential - Atlanta/Douglasville (ATL5) 3.8 km · 54 MW
- Atlanta, GA 3.8 km · 9.5 MW
- Centersquare Atlanta (ATL1-A/B/C) 3.9 km · 36 MW
- DC BLOX data center in Lithia Springs 4.0 km · 32 MW
- Amazon Web Services data center in Lithia Springs 4.1 km · 51 MW
More Vantage Data Centers data centers
- Vantage TX1 United States
- Vantage VA2 United States
- Vantage Data Center FRA21 Germany
- Vantage VA3 United States
- Vantage VA13 United States
- Vantage San Antonio II United States
- Vantage Data Centers - CWL1 United Kingdom
- Vantage Data Centers AZ1 Campus United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.