Vantage Data Centers AZ1 Campus

Vantage Data Centers AZ1 Campus is an operational data center operated by Vantage Data Centers in Goodyear, United States. Our footprint estimate of its power is about 17 MW.

Key facts

StatusOperational
OperatorVantage Data Centers
Facility power17 MW (range 6.7 MW to 42 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 139,416 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 7,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asVantage Data Centers
Coordinates33.44738, -112.37302

Power and grid

Nearest high-voltage substationUnnamed substation, 230 kV, 4.1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km6
UtilityTonopah Irrigation District
Electric retail service territory (HIFLD, US government).
Balancing authorityAZPS
Nearest gas pipelineEl Paso Natural Gas Co, interstate pipeline, 3.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km14 GW in 39 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity311 g CO₂ per kWh (Arizona, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8%
Industrial power priceUSD 0.097 per kWh (Arizona, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature22.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature49.4 °C (2001 to 2025)
Cooling degree days2,422 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.85 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayExtremely High (>80%) (Arizona)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Vantage Data Centers AZ1 Campus use?

We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.

How close is Vantage Data Centers AZ1 Campus to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 4.1 km away. The local utility is Tonopah Irrigation District, in the AZPS balancing area.

How clean is the power for Vantage Data Centers AZ1 Campus?

The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.

Who operates Vantage Data Centers AZ1 Campus?

Vantage Data Centers.

Data centers near Goodyear

More Vantage Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.