Data Center Directory

Microsoft Goodyear Airpark Campus

Microsoft Goodyear Airpark Campus is an operational data center in Goodyear, United States. Our footprint estimate of its power is about 111 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
Facility power111 MW (range 44 MW to 278 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 925,378 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 47,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates33.41383, -112.36625

Power and grid

Nearest high-voltage substationUnnamed substation, 230 kV, 400 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km4
UtilitySalt River Project (political subdivision)
Electric retail service territory (HIFLD, US government).
Balancing authoritySRP
Nearest gas pipelineEl Paso Natural Gas Co, interstate pipeline, 500 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km14 GW in 39 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity311 g CO₂ per kWh (Arizona, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8%
Industrial power priceUSD 0.097 per kWh (Arizona, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature22.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature49.4 °C (2001 to 2025)
Cooling degree days2,422 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.85 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayExtremely High (>80%) (Arizona)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Microsoft Goodyear Airpark Campus use?

We estimate the facility power at about 111 MW. Estimate from building footprint, low confidence.

What chips does Microsoft Goodyear Airpark Campus use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How close is Microsoft Goodyear Airpark Campus to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 400 m away. The local utility is Salt River Project, in the SRP balancing area.

How clean is the power for Microsoft Goodyear Airpark Campus?

The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.

Data centers near Goodyear

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.