Microsoft Goodyear Airpark Campus
Microsoft Goodyear Airpark Campus is an operational data center in Goodyear, United States. Our footprint estimate of its power is about 111 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 111 MW (range 44 MW to 278 MW) Estimate from building footprint, low confidence. Footprint estimate: about 925,378 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 47,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.41383, -112.36625 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 400 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Utility | Salt River Project (political subdivision) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SRP |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 500 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 14 GW in 39 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 49.4 °C (2001 to 2025) |
| Cooling degree days | 2,422 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.85 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Goodyear Airpark Campus use?
We estimate the facility power at about 111 MW. Estimate from building footprint, low confidence.
What chips does Microsoft Goodyear Airpark Campus use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How close is Microsoft Goodyear Airpark Campus to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 400 m away. The local utility is Salt River Project, in the SRP balancing area.
How clean is the power for Microsoft Goodyear Airpark Campus?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Data centers near Goodyear
- PHX-13 285 m · 21 MW
- Microsoft Goodyear 555 m · 263 MW
- Stream Data Centers PHXA Campus 604 m · 47 MW
- Stream Phoenix 857 m · 77 MW
- Stack Infrastructure PHX01 Campus 1.1 km · 26 MW
- Vantage Data Centers AZ2 Campus 1.2 km · 14 MW
- Data center in Goodyear 3.0 km · 35 MW
- Compass Datacenters Goodyear Campus 3.3 km · 84 MW