PHX-13
PHX-13 is an operational data center operated by Microsoft in Goodyear, United States. Our footprint estimate of its power is about 21 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 21 MW (range 10 MW to 33 MW) Estimate from building footprint, low confidence. Footprint estimate: about 17,363 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 9,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | PHX-14 |
| Address | West Broadway Road 14250, 85338, Goodyear |
| Coordinates | 33.41154, -112.36485 |
Power and grid
| Utility | Salt River Project (political subdivision) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | SRP |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 800 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 49.4 °C (2001 to 2025) |
| Cooling degree days | 2,422 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.85 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does PHX-13 use?
We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.
What chips does PHX-13 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How clean is the power for PHX-13?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Who operates PHX-13?
Microsoft.
Data centers near Goodyear
- Microsoft Goodyear 284 m · 263 MW
- Microsoft Goodyear Airpark Campus 285 m · 111 MW
- Stream Data Centers PHXA Campus 604 m · 47 MW
- Stream Phoenix 992 m · 77 MW
- Vantage Data Centers AZ2 Campus 1.1 km · 14 MW
- Stack Infrastructure PHX01 Campus 1.1 km · 26 MW
- Data center in Goodyear 3.3 km · 35 MW
- Compass Datacenters Goodyear Campus 3.6 km · 84 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.