Stream Phoenix
Stream Phoenix is an operational data center that is still expanding, in Goodyear, United States. Its power is about 77 MW, growing to about 267 MW by 2030-01. Epoch AI estimates about 46,000 H100-equivalent AI chips (H100).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Facility power | 77 MW Reported (Epoch AI or owner data) |
| IT power | 64 MW |
| Planned power | 267 MW by 2030-01-01 Epoch AI timeline projection. |
| AI compute | 46,000 H100-equivalents → 160,000 planned |
| AI chips | H100 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 36,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 2.4 billion → 8.3 billion planned Epoch AI estimate, 2025 USD. |
| Also known as | Stream Data Centers PHX-1 |
| Address | 2950 S. Litchfield Road |
| Coordinates | 33.41949, -112.35999 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2022-10-30 | 0 | 0 | Construction beginning, as can be seen on satellite. Major renovations on western side of the non AI building (PX1), including adding generators and cooling towers. |
| 2026-01-31 | 0 | 0 | Major construction has finished on AI building 1, and AI building 6 has been expedited, as depicted by satellite imagery. |
| 2026-05-01 | 77 MW | 46,000 | Estimated: AI building 1 should be operational. Major construction work finished by January 31, 2026, and the shell looked complete by that date. We estimate after three months the building will be operational. |
| 2030-01-01 (projected) | 267 MW | 160,000 | Although official [promotional sources](https://www.streamdatacenters.com/wp-content/uploads/2026/01/SDC-Goodyear-CaseStudy-251218.pdf) estimate the campus to be fully operational in 10-12 years, it is likely to be finished sooner than this given the empirical durations for other data center campuses as well as because AI building 6 has been expedited. The first AI building took approximately 24 months to complete. Assuming construction for a new building starts midway for every building, then the campus will be complete in 4 years for the 5 remaining buildings, since AI buildings 2 and 6 are both underway. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-05-01 | H100 | 46,112 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Stream Phoenix use?
Public data puts the facility power at about 77 MW, with about 267 MW planned by 2030. Reported (Epoch AI or owner data).
What chips does Stream Phoenix use?
Reported chips: H100.
Data centers near Goodyear
- Stack Infrastructure PHX01 Campus 485 m · 26 MW
- Stream Data Centers PHXA Campus 490 m · 47 MW
- Microsoft Goodyear Airpark Campus 857 m · 111 MW
- PHX-13 992 m · 21 MW
- Microsoft Goodyear 1.3 km · 263 MW
- Vantage Data Centers AZ2 Campus 2.0 km · 14 MW
- Data center in Goodyear 2.7 km · 35 MW
- Compass Datacenters Goodyear Campus 3.1 km · 84 MW