Stream Phoenix

Stream Phoenix is an operational data center that is still expanding, in Goodyear, United States. Its power is about 77 MW, growing to about 267 MW by 2030-01. Epoch AI estimates about 46,000 H100-equivalent AI chips (H100).

Power demand is growing at this site

Key facts

StatusOperational, expanding
Facility power77 MW
Reported (Epoch AI or owner data)
IT power64 MW
Planned power267 MW by 2030-01-01
Epoch AI timeline projection.
AI compute46,000 H100-equivalents → 160,000 planned
AI chipsH100
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 36,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 2.4 billion → 8.3 billion planned
Epoch AI estimate, 2025 USD.
Also known asStream Data Centers PHX-1
Address2950 S. Litchfield Road
Coordinates33.41949, -112.35999

Build timeline

DatePowerH100eWhat the satellite images and filings show
2022-10-3000Construction beginning, as can be seen on satellite. Major renovations on western side of the non AI building (PX1), including adding generators and cooling towers.
2026-01-3100Major construction has finished on AI building 1, and AI building 6 has been expedited, as depicted by satellite imagery.
2026-05-0177 MW46,000Estimated: AI building 1 should be operational. Major construction work finished by January 31, 2026, and the shell looked complete by that date. We estimate after three months the building will be operational.
2030-01-01 (projected)267 MW160,000Although official [promotional sources](https://www.streamdatacenters.com/wp-content/uploads/2026/01/SDC-Goodyear-CaseStudy-251218.pdf) estimate the campus to be fully operational in 10-12 years, it is likely to be finished sooner than this given the empirical durations for other data center campuses as well as because AI building 6 has been expedited. The first AI building took approximately 24 months to complete. Assuming construction for a new building starts midway for every building, then the campus will be complete in 4 years for the 5 remaining buildings, since AI buildings 2 and 6 are both underway.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2026-05-01H10046,112Estimate

Satellite view

Questions

How much power does Stream Phoenix use?

Public data puts the facility power at about 77 MW, with about 267 MW planned by 2030. Reported (Epoch AI or owner data).

What chips does Stream Phoenix use?

Reported chips: H100.