Data Center Directory

Vantage Data Centers AZ2 Campus

Vantage Data Centers AZ2 Campus is a data center under construction in Goodyear, United States. Our footprint estimate of its power is about 14 MW.

Key facts

StatusUnder construction
Facility power14 MW (range 5.5 MW to 34 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 114,302 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 6,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressWest Broadway Road 14575, 85338, Goodyear
Coordinates33.40462, -112.37282

Power and grid

Nearest high-voltage substationUnnamed substation, 230 kV, 700 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km4
UtilitySalt River Project (political subdivision)
Electric retail service territory (HIFLD, US government).
Balancing authoritySRP
Nearest gas pipelineEl Paso Natural Gas Co, interstate pipeline, 1.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km14 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity311 g CO₂ per kWh (Arizona, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8%
Industrial power priceUSD 0.097 per kWh (Arizona, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature22.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature49.4 °C (2001 to 2025)
Cooling degree days2,422 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.85 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayExtremely High (>80%) (Arizona)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Vantage Data Centers AZ2 Campus use?

We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.

How close is Vantage Data Centers AZ2 Campus to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 700 m away. The local utility is Salt River Project, in the SRP balancing area.

How clean is the power for Vantage Data Centers AZ2 Campus?

The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.