Stack Infrastructure PHX01 Campus

Stack Infrastructure PHX01 Campus is a data center under construction in Goodyear, United States. Our footprint estimate of its power is about 26 MW.

Key facts

StatusUnder construction
Facility power26 MW (range 10 MW to 65 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 217,382 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 11,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates33.41722, -112.35552

Power and grid

UtilitySalt River Project (political subdivision)
Electric retail service territory (HIFLD, US government).
Balancing authoritySRP
Nearest gas pipelineEl Paso Natural Gas Co, interstate pipeline, 400 m away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity311 g CO₂ per kWh (Arizona, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8%
Industrial power priceUSD 0.097 per kWh (Arizona, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature22.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature49.4 °C (2001 to 2025)
Cooling degree days2,422 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.85 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayExtremely High (>80%) (Arizona)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Stack Infrastructure PHX01 Campus use?

We estimate the facility power at about 26 MW. Estimate from building footprint, low confidence.

How clean is the power for Stack Infrastructure PHX01 Campus?

The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.

Data centers near Goodyear

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.