Microsoft Boydton Data Center

Microsoft Boydton Data Center is an operational data center operated by Microsoft in Henderson, United States. Our footprint estimate of its power is about 243 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power243 MW (range 97 MW to 607 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,023,896 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 100,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates36.68519, -78.37654

Satellite view

Questions

How much power does Microsoft Boydton Data Center use?

We estimate the facility power at about 243 MW. Estimate from building footprint, low confidence.

What chips does Microsoft Boydton Data Center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

Who operates Microsoft Boydton Data Center?

Microsoft.