Microsoft Azure Voyager-EUS2

Microsoft Azure Voyager-EUS2 is an operational AI data center operated by Microsoft in Henderson, United States. Its power is about 1.8 MW. Epoch AI estimates about 666 H100-equivalent AI chips (NVIDIA A100).

Key facts

StatusOperational
OperatorMicrosoft
Facility power1.8 MW
Reported (Epoch AI or owner data)
AI compute666 H100-equivalents
AI chipsNVIDIA A100
Reported (Epoch AI or owner data)
Chip count2,112
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 780 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Address101 Herbert Dr, Boydton, VA 23917
Coordinates36.67676, -78.37650

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 400 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationClover Substation, 500 kV, 36.2 km away
HV substations within 10 km8
UtilityMecklenburg Electric Cooperative (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineTranscontinental Gas PL, interstate pipeline, 10.5 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.5 GW in 40 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days908 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.37 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
Microsoft Azure Voyager-EUS2NVIDIA A1002,1121.8 MW2021-11-01

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Microsoft Azure Voyager-EUS2 use?

Public data puts the facility power at about 1.8 MW. Reported (Epoch AI or owner data).

What chips does Microsoft Azure Voyager-EUS2 use?

Reported chips: NVIDIA A100.

How close is Microsoft Azure Voyager-EUS2 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 400 m away. The local utility is Mecklenburg Electric Cooperative, in the PJM balancing area.

How clean is the power for Microsoft Azure Voyager-EUS2?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates Microsoft Azure Voyager-EUS2?

Microsoft.

Data centers near Henderson

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.