Data center in Henderson

Data center in Henderson is an operational data center in Henderson, United States. Our footprint estimate of its power is about 4.2 MW.

Key facts

StatusOperational
Facility power4.2 MW (range 2.1 MW to 6.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,535 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates36.67854, -78.37669

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 300 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 500 kV, 36 km away
HV substations within 10 km8
UtilityMecklenburg Electric Cooperative (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineTranscontinental Gas PL, interstate pipeline, 10.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.5 GW in 40 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days908 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.37 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Henderson use?

We estimate the facility power at about 4.2 MW. Estimate from building footprint, low confidence.

How close is Data center in Henderson to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 300 m away. The local utility is Mecklenburg Electric Cooperative, in the PJM balancing area.

How clean is the power for Data center in Henderson?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.