Data center in Henderson
Data center in Henderson is an operational data center in Henderson, United States. Our footprint estimate of its power is about 25 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 25 MW (range 12 MW to 40 MW) Estimate from building footprint, low confidence. Footprint estimate: about 20,728 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 11,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 36.69246, -78.37797 |
Power and grid
| Utility | Mecklenburg Electric Cooperative (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 8.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 908 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.37 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Henderson use?
We estimate the facility power at about 25 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Henderson?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Data centers near Henderson
- Data center in Henderson 311 m · 21 MW
- Data center in Henderson 331 m · 18 MW
- Microsoft Boydton Data Center 818 m · 243 MW
- Data center in Henderson 1.1 km · 18 MW
- Data center in Henderson 1.5 km · 13 MW
- Data center in Henderson 1.6 km · 4.2 MW
- Data center in Henderson 1.6 km · 33 MW