Crusoe Abilene Expansion
Crusoe Abilene Expansion is a data center under construction operated by Microsoft in Abilene, United States. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Operator | Microsoft |
| Users | Microsoft (likely) |
| Planned power | 941 MW by 2027-11-11 Epoch AI timeline projection. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| Investors | NVIDIA |
| Address | 5502 Spinks Rd, Abilene, TX 79601 |
| Coordinates | 32.49423, -99.80091 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2025-11-02 | 0 | 0 | Land clearing begins for Buildings 1-2. |
| 2026-01-15 | 0 | 0 | Land clearing continues. |
| 2027-09-17 (projected) | 470 MW | 854,000 | Building 1 operational. Based on the completion date to "build-out an office and data hall", stated in a [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008308). |
| 2027-11-11 (projected) | 941 MW | 1.7 million | Building 2 operational. Based on the completion date to "build-out an office and data hall", stated in a [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008308). |
Source: Epoch AI Frontier Data Centers.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does Crusoe Abilene Expansion use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
Who operates Crusoe Abilene Expansion?
Microsoft. Reported users: Microsoft.
Data centers near Abilene
- OpenAI Stargate Abilene 0 m · 1.2 GW
- Data center in Abilene 658 m · 9 MW
- Data center in Abilene 762 m · 9 MW
- Data center in Abilene 855 m · 9.1 MW
- Data center in Abilene 936 m · 9 MW
- Data center in Abilene 1.5 km · 9 MW
- Data center in Abilene 1.6 km · 9 MW
- Data center in Abilene 1.7 km · 9.1 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
- Microsoft Grange Castle Ireland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.