OpenAI Stargate Abilene
OpenAI Stargate Abilene is an operational AI data center operated by Oracle in Abilene, United States. Its power is about 1.2 GW. Epoch AI estimates about 1.0 million H100-equivalent AI chips (B200, B300).
Key facts
| Status | Operational |
|---|---|
| Operator | Oracle |
| Users | OpenAI |
| Project | Stargate |
| Facility power | 1.2 GW Reported (Epoch AI or owner data) |
| IT power | 824 MW |
| AI compute | 1.0 million H100-equivalents |
| AI chips | B200, B300 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 460,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 31.2 billion Epoch AI estimate, 2025 USD. |
| Builders | Mortenson |
| Energy partners | American Electric Power |
| Investors | Softbank, OpenAI, Oracle |
| Address | 5502 Spinks Rd, Abilene, TX 79601 |
| Coordinates | 32.49423, -99.80091 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-05-31 | 0 | 0 | Land clearing begins for northern two buildings (Building 1-2) |
| 2025-06-28 | 0 | 0 | Building 1 looks close to finishing construction, with chillers in place. OpenAI [stated](https://openai.com/index/five-new-stargate-sites/) that "Oracle began delivering the first NVIDIA GB200 racks in June." The "tenant improvement" work [is not due](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025000156) until September, however. |
| 2025-09-26 | 144 MW | 127,000 | Building 1 is fully operational around this date. The first phase was "live" on September 30 according a Crusoe [announcement](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live). While the first phase consists of Building 1 and 2, the language doesn't outright confirm that both buildings are fully operational. The announcement also stated that "Oracle began delivering the first NVIDIA GB200 racks in June", and we think 3 months is enough time to ram to 50,000 GB200s in Building 1. The satellite image also suggests that Building 1 is complete (shell and equipment done, many cars neatly parked) while Building 2 is ongoing (trucks and construction equipment still present). The 200 MW [substation](https://www.mortenson.com/projects/abilene-data-center-development) built in 2022 and expanded in 2024 is enough to power both buildings. To the right of Building 2, five gas turbines are in place with five more turbines still under construction. Chillers are partly installed for Building 3. Roof is complete for Building 4. The larger 1 GW substation is not complete yet. |
| 2025-12-24 | 288 MW | 255,000 | Building 2 is fully operational. This exact date corresponds to the expected completion date of "Four (4) data hall spaces and an administrative office build-out" according to a [TDLR filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025007742), but this date is also consistent with satellite imagery. By January 15, Building 2 looked as finished as Building 1, whereas on September 26 it did not look finished. |
| 2026-01-15 | 288 MW | 255,000 | The 1 GW substation looks close to completion. Building 3 appears to have all power and cooling equipment installed, but there are still signs of construction work. This seems on track for operation in 3 months. Building 4 has about 80% of chillers installed. Other buildings have few or no chillers installed. |
| 2026-03-24 | 288 MW | 255,000 | Building 3 and 4 look complete, but are not fully operational. Not as many cars are parked next to it as Building 1-2 which suggests they may still be ramping up. Building 4 was due by now according to a [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025014756). Building 5 still has light construction activity, while Building 6 still lacks chillers. The on-site power plant to the right of Building 2 looks complete. |
| 2026-05-23 | 577 MW | 509,000 | Buildings 3 and 4 are estimated to be operational. On April 22nd, Oracle [posted](https://x.com/i/status/2047012589302153558) that "In Abilene, 200MW is already operational". This suggests that there was still only Building 1 and 2 operational. Since Buildings 3 and 4 looked complete from the outside on March 24th, we give it another month after Oracle's post for them to be operational. This would also give the buildings a similar 1 year 4 months timeline that Buildings 1 took from land clearing to being operational. |
| 2026-07-28 | 577 MW | 509,000 | Buildings 5-8 are structurally complete and roofed but not yet confirmed operational (fit-out ongoing). The substation looks complete. |
| 2026-09-10 | 865 MW | 764,000 | Buildings 5-6 are operational. On Oracle's Q1 FY27 earnings call (September 10, 2026), Clay Magouyrk said "6 of the 8 campus buildings, representing 618 megawatts and 75% of total capacity have now been delivered to the customer" ([transcript](https://www.fool.com/earnings/call-transcripts/2026/09/11/oracle-orcl-q1-2027-earnings-call-transcript/)). 618 MW = 6 x 103 MW, matching the per-building IT power figure Crusoe reported earlier. Since Oracle is the chip owner rather than the facility operator, we assume "delivered" means the chips are installed and ready to use. |
| 2026-11-01 | 1.2 GW | 1.0 million | Buildings 7-8 are estimated to be operational. On March 24, Building 8 roughly looked like where Building 3 was in September. Building 3 is estimated to be operational in April, 7 months later. This naively suggests Building 8 will be operational by early November, 7 months after March 24. Oracle gave no date for the last two buildings on its September 10 call. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2025-09-26 | B200 | 50,400 | Reported |
| 2025-12-24 | B200 | 100,800 | Reported |
| 2026-05-23 | B300 | 100,800 | Estimate |
| 2026-09-10 | B300 | 201,600 | Estimate |
| 2026-11-01 | B300 | 302,400 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does OpenAI Stargate Abilene use?
Public data puts the facility power at about 1.2 GW. Reported (Epoch AI or owner data).
What chips does OpenAI Stargate Abilene use?
Reported chips: B200, B300.
Who operates OpenAI Stargate Abilene?
Oracle. Reported users: OpenAI.
Data centers near Abilene
- Crusoe Abilene Expansion 0 m
- Data center in Abilene 658 m · 9 MW
- Data center in Abilene 762 m · 9 MW
- Data center in Abilene 855 m · 9.1 MW
- Data center in Abilene 936 m · 9 MW
- Data center in Abilene 1.5 km · 9 MW
- Data center in Abilene 1.6 km · 9 MW
- Data center in Abilene 1.7 km · 9.1 MW
More Oracle data centers
- OpenAI Stargate New Mexico United States
- OpenAI Stargate Shackelford United States
- OpenAI Stargate Michigan United States
- OpenAI Stargate Wisconsin United States
- Oracle Batam Indonesia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.