OpenAI Stargate Shackelford
OpenAI Stargate Shackelford is a data center under construction operated by Oracle in Shackelford County, United States. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (some AMD Instinct) (guess).
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Operator | Oracle |
| Users | OpenAI |
| Project | Stargate |
| Planned power | 2.0 GW by 2028-11-11 Epoch AI timeline projection. |
| AI chips | NVIDIA GPUs (some AMD Instinct) Guess from the operator, not confirmed. Oracle Cloud sells NVIDIA and AMD GPU capacity. |
| Investors | Oracle, OpenAI |
| Address | 175 Private Road 1604, Abilene, TX 79601, Shackelford County |
| Coordinates | 32.59656, -99.50209 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2025-08-01 | 0 | 0 | Land clearing begins. |
| 2026-01-18 | 0 | 0 | The layout of Buildings 1-5 is visible. Steel framing has just started on Building 1. |
| 2026-04-14 | 0 | 0 | Steel framing is underway for Buildings 1-3, and roofing is underway for Building 1. |
| 2026-09-04 | 0 | 0 | Buildings 1-5 shells complete and fully roofed. Buildings 1-3 appear to be actively installing cooling and backup generators nearby. The pads for Buildings 6-10 to the north have also been visibly cleared, with foundations for Buildings 6 and 7 underway. |
| 2027-08-15 (projected) | 196 MW | 355,000 | Building 1 is operational (estimate). TDLR lists the construction completion date for Building 1 as 2027-02-15. We add 6 months for commissioning, installation etc. before assuming the building is fully operational. |
| 2027-10-19 (projected) | 392 MW | 712,000 | Building 2 is operational (estimate). TDLR lists the construction completion date for Building 2 as 2027-04-19. We add 6 months for commissioning, installation etc. before assuming the building is fully operational. |
| 2027-11-18 (projected) | 588 MW | 1.1 million | Building 3 is operational (estimate). TDLR lists the construction completion date for Building 3 as 2027-05-18. We add 6 months for commissioning, installation etc. before assuming the building is fully operational. |
| 2028-02-11 (projected) | 784 MW | 1.4 million | Building 4 is operational (estimate). TDLR lists the construction completion date for Building 4 as 2027-08-11. We add 6 months for commissioning, installation etc. before assuming the building is fully operational. |
| 2028-03-08 (projected) | 980 MW | 1.8 million | Building 5 is operational (estimate). TDLR lists the construction completion date for Building 5 as 2027-09-08. We add 6 months for commissioning, installation etc. before assuming the building is fully operational. |
| 2028-04-04 (projected) | 1.2 GW | 2.3 million | Building 6 is operational (estimate). TDLR lists the construction completion date for Building 6 as 2027-10-04. We add 6 months for commissioning, installation etc. before assuming the building is fully operational. |
| 2028-05-12 (projected) | 1.4 GW | 2.9 million | Building 7 is operational (estimate). TDLR lists the construction completion date for Building 7 as 2027-11-12. We add 6 months for commissioning, installation etc. before assuming the building is fully operational. |
| 2028-10-17 (projected) | 1.6 GW | 3.5 million | Building 8 is operational (estimate). TDLR lists the construction completion date for Building 8 as 2028-04-17. We add 6 months for commissioning, installation etc. before assuming the building is fully operational. |
| 2028-10-18 (projected) | 1.8 GW | 4.0 million | Building 9 is operational (estimate). TDLR lists the construction completion date for Building 9 as 2028-04-18. We add 6 months for commissioning, installation etc. before assuming the building is fully operational. |
| 2028-11-11 (projected) | 2.0 GW | 4.6 million | Building 10 is operational (estimate). TDLR lists the construction completion date for Building 10 as 2028-05-11. We add 6 months for commissioning, installation etc. before assuming the building is fully operational. |
Source: Epoch AI Frontier Data Centers.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does OpenAI Stargate Shackelford use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some AMD Instinct).
Who operates OpenAI Stargate Shackelford?
Oracle. Reported users: OpenAI.
Data centers near Shackelford County
- Data center in Abilene 27.8 km · 9 MW
- Data center in Abilene 27.9 km · 9.1 MW
- Data center in Abilene 27.9 km · 9 MW
- Data center in Abilene 28.0 km · 9 MW
- Data center in Abilene 28.0 km · 9.1 MW
- Data center in Abilene 28.0 km · 9 MW
- Data center in Abilene 28.1 km · 9 MW
- Data center in Abilene 28.2 km · 9 MW
More Oracle data centers
- OpenAI Stargate New Mexico United States
- OpenAI Stargate Michigan United States
- OpenAI Stargate Wisconsin United States
- OpenAI Stargate Abilene United States
- Oracle Batam Indonesia
Sources
- Epoch AI, Frontier Data Centers
- Vantage data center page with power capacity, number of buildings, and first building timeline
- OpenAI Stargate expansion announcement mentioning Shackelford site
- Vantage LinkedIn post connecting the data center to OpenAI Stargate
- TDLR filing for first building (other buildings are also on TDLR)
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.