Data center in Abilene
Data center in Abilene is an operational data center in Abilene, United States. Our footprint estimate of its power is about 9.1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 9.1 MW (range 4.5 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,558 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 32.49811, -99.77731 |
Power and grid
| Utility | Coleman County Elec Coop, INC Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | Atmos Pipeline - Texas, intrastate pipeline, 300 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 18.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.7 °C (2001 to 2025) |
| Cooling degree days | 1,455 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.1 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Abilene use?
We estimate the facility power at about 9.1 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Abilene?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Data centers near Abilene
- Data center in Abilene 188 m · 9 MW
- Data center in Abilene 207 m · 9 MW
- Data center in Abilene 280 m · 9 MW
- Data center in Abilene 583 m · 9.1 MW
- Data center in Abilene 621 m · 9 MW
- Data center in Abilene 689 m · 9.1 MW
- Data center in Abilene 735 m · 9 MW
- Data center in Abilene 769 m · 9 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.