Data center in Abilene
Data center in Abilene is an operational data center in Abilene, United States. Our footprint estimate of its power is about 9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 9 MW (range 4.5 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,538 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 32.49994, -99.78357 |
Power and grid
| Utility | Coleman County Elec Coop, INC Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | Atmos Pipeline - Texas, intrastate pipeline, 900 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 18.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.7 °C (2001 to 2025) |
| Cooling degree days | 1,455 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.1 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Abilene use?
We estimate the facility power at about 9 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Abilene?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Data centers near Abilene
- Data center in Abilene 185 m · 9 MW
- Data center in Abilene 207 m · 9.1 MW
- Data center in Abilene 278 m · 9 MW
- Data center in Abilene 396 m · 9 MW
- Data center in Abilene 449 m · 9 MW
- Data center in Abilene 552 m · 9 MW
- Data center in Abilene 583 m · 9 MW
- Data center in Abilene 621 m · 9.1 MW