QTS Atlanta-Fayetteville (ATL2)
QTS Atlanta-Fayetteville (ATL2) is an operational data center operated by QTS Realty Trust in Fayetteville, United States. Our footprint estimate of its power is about 31 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | QTS Realty Trust |
| Facility power | 31 MW (range 15 MW to 49 MW) Estimate from building footprint, low confidence. Footprint estimate: about 25,756 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | QTS |
| Address | 1435 HWY 54 W |
| Coordinates | 33.44879, -84.52229 |
| Website | qtsdatacenters.com/data-centers/fayetteville |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 300 m away (Georgia Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 11 |
| Utility | Coweta-Fayette El Member Corp (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SOCO |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 3.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 7.6 GW in 14 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 352 g CO₂ per kWh (Georgia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6% |
| Industrial power price | USD 0.131 per kWh (Georgia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.4 °C (2001 to 2025) |
| Cooling degree days | 1,093 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.51 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Medium - High (20-40%) (Georgia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does QTS Atlanta-Fayetteville (ATL2) use?
We estimate the facility power at about 31 MW. Estimate from building footprint, low confidence.
How close is QTS Atlanta-Fayetteville (ATL2) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 300 m away. The local utility is Coweta-Fayette El Member Corp, in the SOCO balancing area.
How clean is the power for QTS Atlanta-Fayetteville (ATL2)?
The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.
Who operates QTS Atlanta-Fayetteville (ATL2)?
QTS Realty Trust.
Data centers near Fayetteville
- QTS 264 m · 31 MW
- Microsoft Fairwater Atlanta 404 m · 859 MW
- QTS 1.5 km · 57 MW
- QTS 1.8 km · 39 MW
- Microsoft East Point Datacenter Campus 21.4 km · 36 MW
- Digital Realty Data Center 25.2 km · 23 MW
- Westlake Data Center 29.5 km · 14 MW
- Microsoft 30.5 km · 3.9 MW
More QTS Realty Trust data centers
- QTS Atlanta-Metro (ATL1) United States
- QTS Atlanta-Suwanee (SUW1) United States
- QTS Irving - Dallas (DFW1) United States
- QTS Chicago (CHI1) United States
- QTS Eemshaven (EEM1) Netherlands
- QTS Sacramento (SAC1) United States
- QTS Ashburn (ASH1) United States
- QTS Santa Clara (SJC1/SJC2) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.