MineOne Wyoming Data Center is an operational data center operated by MineOne in Cheyenne, United States. Our footprint estimate of its power is about 4.6 MW.

Key facts

StatusOperational
OperatorMineOne
Facility power4.6 MW (range 1.8 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 38,007 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 2,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates41.12499, -104.89485

Power and grid

Nearest high-voltage substationMicrosoft/Data Center Substation, 115 kV, 800 m away (Cheyenne Light Fuel and Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationCheyenne Substation, 230 kV, 7 km away
HV substations within 10 km14
UtilityCheyenne Light Fuel & Power (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityWACM
Nearest gas pipelineWyoming Interstate PL Co, interstate pipeline, 5.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.1 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity145 g CO₂ per kWh (South Dakota, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 58%, hydro 22.3%, coal 9.3%, gas 8.5%, solar 2%. Clean power: 82.3%
Industrial power priceUSD 0.094 per kWh (South Dakota, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature8.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.4 °C (2001 to 2025)
Cooling degree days304 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.57 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow - Medium (10-20%) (South Dakota)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does MineOne Wyoming Data Center use?

We estimate the facility power at about 4.6 MW. Estimate from building footprint, low confidence.

How close is MineOne Wyoming Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is Microsoft/Data Center Substation (115 kV), about 800 m away. The local utility is Cheyenne Light Fuel & Power, in the WACM balancing area.

How clean is the power for MineOne Wyoming Data Center?

The grid in South Dakota emits about 145 g CO₂ per kWh (2025). Largest sources: wind 58%, hydro 22.3%, coal 9.3%.

Who operates MineOne Wyoming Data Center?

MineOne.

Data centers near Cheyenne

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.