University Corporation for Atmospheric Research data center in Cheyenne
University Corporation for Atmospheric Research data center in Cheyenne is an operational data center operated by University Corporation for Atmospheric Research in Cheyenne, United States. Our footprint estimate of its power is about 6.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | University Corporation for Atmospheric Research |
| Facility power | 6.4 MW (range 2.6 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 53,381 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | NCAR-Wyoming Supercomputing Center |
| Coordinates | 41.12856, -104.89688 |
| Website | nwsc.ucar.edu/visitor-center |
Power and grid
| Nearest high-voltage substation | Microsoft/Data Center Substation, 115 kV, 600 m away (Cheyenne Light Fuel and Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Cheyenne Substation, 230 kV, 7.3 km away |
| HV substations within 10 km | 14 |
| Utility | Cheyenne Light Fuel & Power (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | WACM |
| Nearest gas pipeline | Wyoming Interstate PL Co, interstate pipeline, 5.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.1 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 620 g CO₂ per kWh (Wyoming, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 58.5%, wind 27.1%, gas 10%, hydro 2.1%, solar 1.2%. Clean power: 30.4% |
| Industrial power price | USD 0.088 per kWh (Wyoming, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.4 °C (2001 to 2025) |
| Cooling degree days | 304 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.57 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | High (40-80%) (Wyoming) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does University Corporation for Atmospheric Research data center in Cheyenne use?
We estimate the facility power at about 6.4 MW. Estimate from building footprint, low confidence.
How close is University Corporation for Atmospheric Research data center in Cheyenne to the power grid?
The nearest high-voltage substation in OpenStreetMap is Microsoft/Data Center Substation (115 kV), about 600 m away. The local utility is Cheyenne Light Fuel & Power, in the WACM balancing area.
How clean is the power for University Corporation for Atmospheric Research data center in Cheyenne?
The grid in Wyoming emits about 620 g CO₂ per kWh (2025). Largest sources: coal 58.5%, wind 27.1%, gas 10%.
Who operates University Corporation for Atmospheric Research data center in Cheyenne?
University Corporation for Atmospheric Research.
Data centers near Cheyenne
- Data center in Cheyenne 323 m · 3.2 MW
- Microsoft data center in Cheyenne 378 m · 5.3 MW
- MineOne Wyoming Data Center 432 m · 4.6 MW
- ACT Cheyenne 433 m
- Data center in Cheyenne 487 m · 14 MW
- Data center in Cheyenne 542 m · 5.8 MW
- Microsoft CYS Datacenter 866 m · 131 MW
- CYS42 Datacenter 1.1 km · 6.1 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.