Microsoft DUB03 / DUB04
Microsoft DUB03 / DUB04 is an operational data center operated by Microsoft in Lucan, Ireland. Our footprint estimate of its power is about 65 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 65 MW (range 32 MW to 104 MW) Estimate from building footprint, low confidence. Footprint estimate: about 53,975 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 28,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Microsoft DUB05 |
| Coordinates | 53.32483, -6.45426 |
Power and grid
| Nearest high-voltage substation | Kilmahud 110kV Substation, 110 kV, 100 m away (EirGrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Castlebaggot 220kV Substation, 220 kV, 1 km away |
| HV substations within 10 km | 31 |
| Power plants within 50 km | 3.5 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 261 g CO₂ per kWh (Ireland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8% |
| Industrial power price | EUR 0.206 per kWh (Ireland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 24.3 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.74 kWh per m² per day |
| Wind at 50 m | 8 m/s average |
| Water stress today | Low (<10%) (Ireland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft DUB03 / DUB04 use?
We estimate the facility power at about 65 MW. Estimate from building footprint, low confidence.
What chips does Microsoft DUB03 / DUB04 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How close is Microsoft DUB03 / DUB04 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Kilmahud 110kV Substation (110 kV), about 100 m away.
How clean is the power for Microsoft DUB03 / DUB04?
The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.
Who operates Microsoft DUB03 / DUB04?
Microsoft.
Data centers near Lucan
- Digital Realty Dublin DUB3 259 m
- Microsoft DUB14 384 m · 14 MW
- EdgeConnex DUB04 405 m · 27 MW
- EdgeConneX data center in Lucan 411 m · 11 MW
- Microsoft Grange Castle 537 m · 111 MW
- Data center in Lucan 607 m · 29 MW
- Data center in Clondalkin 612 m
- Data center in Clondalkin 746 m · 21 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States