EdgeConnex DUB04
EdgeConnex DUB04 is an operational data center operated by EdgeConneX in Lucan, Ireland. Our footprint estimate of its power is about 27 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeConneX |
| Facility power | 27 MW (range 14 MW to 44 MW) Estimate from building footprint, low confidence. Footprint estimate: about 22,804 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 53.32620, -6.45990 |
Power and grid
| Nearest high-voltage substation | Kishoge 110 kV Substation, 110 kV, 200 m away (EirGrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Castlebaggot 220kV Substation, 220 kV, 1.3 km away |
| HV substations within 10 km | 33 |
| Power plants within 50 km | 3.5 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 261 g CO₂ per kWh (Ireland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8% |
| Industrial power price | EUR 0.206 per kWh (Ireland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 24.3 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.74 kWh per m² per day |
| Wind at 50 m | 8 m/s average |
| Water stress today | Low (<10%) (Ireland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does EdgeConnex DUB04 use?
We estimate the facility power at about 27 MW. Estimate from building footprint, low confidence.
How close is EdgeConnex DUB04 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Kishoge 110 kV Substation (110 kV), about 200 m away.
How clean is the power for EdgeConnex DUB04?
The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.
Who operates EdgeConnex DUB04?
EdgeConneX.
Data centers near Lucan
- Data center in Lucan 253 m · 29 MW
- Microsoft DUB03 / DUB04 405 m · 65 MW
- EdgeConneX data center in Lucan 478 m · 11 MW
- Digital Realty Dublin DUB3 657 m
- Microsoft DUB14 750 m · 14 MW
- Data center in Clondalkin 866 m
- Microsoft Grange Castle 940 m · 111 MW
- Data center in Clondalkin 998 m · 22 MW
More EdgeConneX data centers
- EdgeConneX PHX02 Data Center United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConneX Germany
- EdgeConneX Chicago (EDCCHI02) United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex - DEN02 United States
- EdgeConneX data center in Lucan Ireland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.