Data center in Lucan
Data center in Lucan is an operational data center in Lucan, Ireland. Our footprint estimate of its power is about 29 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 29 MW (range 14 MW to 46 MW) Estimate from building footprint, low confidence. Footprint estimate: about 24,032 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 53.32833, -6.46128 |
Power and grid
| Grid carbon intensity | 261 g CO₂ per kWh (Ireland, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8% |
| Industrial power price | EUR 0.206 per kWh (Ireland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 24.3 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.74 kWh per m² per day |
| Wind at 50 m | 8 m/s average |
| Water stress today | Low (<10%) (Ireland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Lucan use?
We estimate the facility power at about 29 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Lucan?
The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.
Data centers near Lucan
- EdgeConnex DUB04 253 m · 27 MW
- EdgeConneX data center in Lucan 494 m · 11 MW
- Microsoft DUB03 / DUB04 607 m · 65 MW
- Digital Realty Dublin DUB3 865 m
- Microsoft DUB14 978 m · 14 MW
- Data center in Clondalkin 1.1 km
- Microsoft Grange Castle 1.1 km · 111 MW
- Digital Realty Dublin DUB3 1.2 km · 5.2 MW
Sources