EdgeConneX Chicago (EDCCHI02)
EdgeConneX Chicago (EDCCHI02) is a data center under construction operated by EdgeConneX in Elk Grove Village, United States. Our footprint estimate of its power is about 22 MW.
Key facts
| Status | Under construction |
|---|---|
| Operator | EdgeConneX |
| Facility power | 22 MW (range 11 MW to 35 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,063 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | EdgeConneX CHI01 · EdgeConneX Data Center · EdgeConneX CHI02 |
| Address | 2021 Lunt Avenue |
| Coordinates | 42.00136, -87.95263 |
| Website | edgeconnex.com |
Power and grid
| Nearest high-voltage substation | Tonne 138kV Substation, 138 kV, 2.2 km away (Commonwealth Edison) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | ComEd Itasca 138kV-345kV Substation, 345 kV, 4.3 km away |
| HV substations within 10 km | 18 |
| Utility | Commonwealth Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Natural Gas PL Co of Am, interstate pipeline, 900 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.0 GW in 29 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 247 g CO₂ per kWh (Illinois, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3% |
| Industrial power price | USD 0.113 per kWh (Illinois, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.5 °C (2001 to 2025) |
| Cooling degree days | 465 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Medium - High (20-40%) (Illinois) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does EdgeConneX Chicago (EDCCHI02) use?
We estimate the facility power at about 22 MW. Estimate from building footprint, low confidence.
How close is EdgeConneX Chicago (EDCCHI02) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Tonne 138kV Substation (138 kV), about 2.2 km away. The local utility is Commonwealth Edison Co, in the PJM balancing area.
How clean is the power for EdgeConneX Chicago (EDCCHI02)?
The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.
Who operates EdgeConneX Chicago (EDCCHI02)?
EdgeConneX.
Data centers near Elk Grove Village
- Stream Data Centers - Chicago I 156 m · 15 MW
- Equinix CH3 - Elk Grove 188 m · 76 MW
- Stream Data Centers - Chicago II 529 m · 19 MW
- Digital Realty CH2 - Chicago 901 m · 30 MW
- Stream Data Centers 1.1 km · 17 MW
- Digital Realty CH1 - Chicago 1.1 km · 149 MW
- Centersquare Chicago (ORD2) 1.1 km · 43 MW
- Forsythe Data Centers 1.2 km · 28 MW
More EdgeConneX data centers
- EdgeConneX PHX02 Data Center United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex DUB04 Ireland
- EdgeConneX Germany
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex - DEN02 United States
- EdgeConneX data center in Lucan Ireland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.