Forsythe Data Centers
Forsythe Data Centers is an operational data center operated by Forsythe Data Centers in Elk Grove Village, United States. Our footprint estimate of its power is about 28 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Forsythe Data Centers |
| Facility power | 28 MW (range 14 MW to 45 MW) Estimate from building footprint, low confidence. Footprint estimate: about 23,298 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | STACK Chicago CHI01 |
| Address | 1441 Touhy Ave |
| Coordinates | 42.00687, -87.96457 |
| Website | datacenters.forsythe.com |
Power and grid
| Nearest high-voltage substation | Tonne 138kV Substation, 138 kV, 1.6 km away (Commonwealth Edison) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | ComEd Itasca 138kV-345kV Substation, 345 kV, 4 km away |
| HV substations within 10 km | 17 |
| Utility | Commonwealth Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Natural Gas PL Co of Am, interstate pipeline, 300 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.0 GW in 30 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 247 g CO₂ per kWh (Illinois, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3% |
| Industrial power price | USD 0.113 per kWh (Illinois, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.5 °C (2001 to 2025) |
| Cooling degree days | 465 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Medium - High (20-40%) (Illinois) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Forsythe Data Centers use?
We estimate the facility power at about 28 MW. Estimate from building footprint, low confidence.
How close is Forsythe Data Centers to the power grid?
The nearest high-voltage substation in OpenStreetMap is Tonne 138kV Substation (138 kV), about 1.6 km away. The local utility is Commonwealth Edison Co, in the PJM balancing area.
How clean is the power for Forsythe Data Centers?
The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.
Who operates Forsythe Data Centers?
Forsythe Data Centers.
Data centers near Elk Grove Village
- EdgeConnex Data Center 797 m · 7.1 MW
- Stream Data Centers - Chicago II 1.0 km · 19 MW
- Equinix CH3 - Elk Grove 1.0 km · 76 MW
- Stream Data Centers 1.1 km · 17 MW
- EdgeConneX Chicago (EDCCHI02) 1.2 km · 22 MW
- Stream Data Centers - Chicago I 1.2 km · 15 MW
- Digital Realty CH1 - Chicago 1.4 km · 149 MW
- Digital Realty CH3 - Chicago 1.5 km · 35 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.