EdgeConneX is an operational data center operated by EdgeConneX in Dietzenbach, Germany. Our footprint estimate of its power is about 24 MW.

Key facts

StatusOperational
OperatorEdgeConneX
Facility power24 MW (range 12 MW to 38 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 19,827 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 10,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressWaldstraße 43-45
Coordinates50.02294, 8.80692

Power and grid

Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does EdgeConneX use?

We estimate the facility power at about 24 MW. Estimate from building footprint, low confidence.

How clean is the power for EdgeConneX?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates EdgeConneX?

EdgeConneX.

Data centers near Dietzenbach

More EdgeConneX data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.