Vantage Data Center (FRA1)
Vantage Data Center (FRA1) is an operational data center operated by Vantage Data Centers in Offenbach am Main, Germany. Our footprint estimate of its power is about 7.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Vantage Data Centers |
| Facility power | 7.6 MW (range 3.8 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,357 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Goethering 27, 63067, Offenbach am Main |
| Coordinates | 50.10912, 8.74383 |
| Website | vantage-dc.com/data-center-locations/emea/frankfurt-i-germany |
Power and grid
| Nearest high-voltage substation | 110 KV Schaltanlage, 110 kV, 300 m away (Energieversorgung Offenbach) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Umspannwerk Frankfurt Nord, 220 kV, 5.6 km away |
| HV substations within 10 km | 31 |
| Power plants within 50 km | 3.0 GW in 44 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.8 °C (2001 to 2025) |
| Cooling degree days | 233 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.98 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Vantage Data Center (FRA1) use?
We estimate the facility power at about 7.6 MW. Estimate from building footprint, low confidence.
How close is Vantage Data Center (FRA1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is 110 KV Schaltanlage (110 kV), about 300 m away.
How clean is the power for Vantage Data Center (FRA1)?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates Vantage Data Center (FRA1)?
Vantage Data Centers.
Data centers near Offenbach am Main
- maincubes FRANKFURT-01 77 m · 2.8 MW
- maincubes FRA01 112 m · 2 MW
- EXA Edge DC Frankfurt1 1.2 km · 16 MW
- Digital Realty Frankfurt FRA1-27 1.3 km · 31 MW
- Digital Realty FRA16 1.3 km · 20 MW
- NTT Frankfurt 2 Data Center (FRA2) 1.4 km · 48 MW
- COLT DC Frankfurt 1.4 km · 2 MW
- iNTERWERK Rechenzentrum 1.5 km · 4 MW
More Vantage Data Centers data centers
- Vantage TX1 United States
- Vantage VA2 United States
- Vantage Data Center FRA21 Germany
- Vantage VA3 United States
- Vantage VA13 United States
- Vantage San Antonio II United States
- Vantage Data Centers - CWL1 United Kingdom
- Vantage Data Centers AZ1 Campus United States
Sources