Project Ginger East is an operational data center operated by Microsoft in West Des Moines, United States. Our footprint estimate of its power is about 67 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power67 MW (range 27 MW to 168 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 561,217 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 29,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressSoutheast Maffitt Lake Road 1475, West Des Moines
Coordinates41.51541, -93.71958

Power and grid

Nearest high-voltage substationUnnamed substation, 161 kV, 400 m away (MidAmerican Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationNorwalk Substation, 345 kV, 7.1 km away
HV substations within 10 km12
UtilityMidamerican Energy Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Nearest gas pipelineNorthern Natural Gas Co, interstate pipeline, 13.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.2 GW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity313 g CO₂ per kWh (Iowa, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 58.5%, coal 25.6%, gas 11.6%, solar 2.5%, hydro 1.4%. Clean power: 62.8%
Industrial power priceUSD 0.093 per kWh (Iowa, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature10.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.6 °C (2001 to 2025)
Cooling degree days586 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.09 kWh per m² per day
Wind at 50 m6.9 m/s average
Water stress todayLow - Medium (10-20%) (Iowa)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Project Ginger East use?

We estimate the facility power at about 67 MW. Estimate from building footprint, low confidence.

What chips does Project Ginger East use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How close is Project Ginger East to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (161 kV), about 400 m away. The local utility is Midamerican Energy Co, in the MISO balancing area.

How clean is the power for Project Ginger East?

The grid in Iowa emits about 313 g CO₂ per kWh (2025). Largest sources: wind 58.5%, coal 25.6%, gas 11.6%.

Who operates Project Ginger East?

Microsoft.

Data centers near West Des Moines

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.