Data Center Directory

Project Mountain

Project Mountain is an operational data center operated by Microsoft in West Des Moines, United States. Our footprint estimate of its power is about 17 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power17 MW (range 6.6 MW to 41 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 137,872 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 7,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asMicrosoft
AddressGrand Avenue 8855, 50266, West Des Moines
Coordinates41.54020, -93.82685

Power and grid

Nearest high-voltage substationMicrosoft Project Mountain Data Center, 161 kV, 200 m away (MidAmerican Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationBooneville Substation, 345 kV, 8.6 km away
HV substations within 10 km13
UtilityMidamerican Energy Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Nearest gas pipelineNorthern Natural Gas Co, interstate pipeline, 17.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.2 GW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity313 g CO₂ per kWh (Iowa, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 58.5%, coal 25.6%, gas 11.6%, solar 2.5%, hydro 1.4%. Clean power: 62.8%
Industrial power priceUSD 0.093 per kWh (Iowa, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature10.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.6 °C (2001 to 2025)
Cooling degree days586 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.09 kWh per m² per day
Wind at 50 m6.9 m/s average
Water stress todayLow - Medium (10-20%) (Iowa)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Project Mountain use?

We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.

What chips does Project Mountain use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How close is Project Mountain to the power grid?

The nearest high-voltage substation in OpenStreetMap is Microsoft Project Mountain Data Center (161 kV), about 200 m away. The local utility is Midamerican Energy Co, in the MISO balancing area.

How clean is the power for Project Mountain?

The grid in Iowa emits about 313 g CO₂ per kWh (2025). Largest sources: wind 58.5%, coal 25.6%, gas 11.6%.

Who operates Project Mountain?

Microsoft.

Data centers near West Des Moines

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.