Microsoft SAT14 is an operational data center operated by Valero in Leon Valley, United States. Our footprint estimate of its power is about 18 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Valero |
| Facility power | 18 MW (range 7.2 MW to 45 MW) Estimate from building footprint, low confidence. Footprint estimate: about 150,196 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 7,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Valero Wiserman |
| Coordinates | 29.47528, -98.68100 |
Power and grid
| Utility | City Of San Antonio (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | El Paso Texas Pipeline Co, intrastate pipeline, 3.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.5 °C (2001 to 2025) |
| Cooling degree days | 1,804 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.84 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft SAT14 use?
We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.
What chips does Microsoft SAT14 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How clean is the power for Microsoft SAT14?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates Microsoft SAT14?
Valero.
Data centers near Leon Valley
- Microsoft SAT14 235 m · 66 MW
- CHRISTUS Health data center in Leon Valley 745 m · 8.9 MW
- Frost Bank data center in Leon Valley 857 m · 11 MW
- Lowe's Data Center 861 m · 11 MW
- CyrusOne San Antonio II 912 m · 19 MW
- Stream Data Centers - San Antonio II 994 m · 18 MW
- Microsoft 994 m · 37 MW
- CyrusOne San Antonio 1.2 km · 4.7 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.