Microsoft SAT14
Microsoft SAT14 is an operational AI data center operated by Microsoft in San Antonio, United States. Its power is about 66 MW. Epoch AI estimates about 45,000 H100-equivalent AI chips (H100, B300).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 66 MW Reported (Epoch AI or owner data) |
| IT power | 47 MW |
| AI compute | 45,000 H100-equivalents |
| AI chips | H100, B300 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 26,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 1.8 billion Epoch AI estimate, 2025 USD. |
| Address | 3545 Wiseman Boulevard, San Antonio, TX 78251 |
| Coordinates | 29.47321, -98.68146 |
Power and grid
| Utility | City Of San Antonio (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | El Paso Texas Pipeline Co, intrastate pipeline, 3.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.5 °C (2001 to 2025) |
| Cooling degree days | 1,804 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.84 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2022-02-18 | 0 | 0 | Land clearing for the site is almost complete. Informed using imagery on [Google Earth](https://earth.google.com/web/@29.476115,-98.68118,277.21295794a,724.52967601d,35y,0h,0t,0r/) |
| 2024-07-01 | 26 MW | 13,000 | Building 1 operational. The first 2 data halls of Building 1 (with chillers already installed) are likely to be already operational. Although construction was completed prior, the on-site substation was previously incomplete, so we believe it was only operational at this point. |
| 2025-08-03 | 26 MW | 13,000 | Building 2 chiller installation is a little more than halfway complete, and chiller installation for the last data hall of Building 1 is also around halfway complete. |
| 2026-02-28 | 26 MW | 13,000 | No more visible construction around either building, just a little equipment. Roads fully built around buildings as well. |
| 2026-03-31 | 66 MW | 45,000 | Building 2 fully operational, Building 1 expanded. Construction is already visibly complete. Additionally, construction phases [Phase 2](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019471), [Phase 3](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019588), and [Phase 4](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019686) on TDLR that collectively represent the completion of the site have a completion date of 2026-03-31. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2024-07-01 | H100 | 12,963 | Estimate |
| 2026-03-31 | B300 | 12,750 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft SAT14 use?
Public data puts the facility power at about 66 MW. Reported (Epoch AI or owner data).
What chips does Microsoft SAT14 use?
Reported chips: H100, B300.
How clean is the power for Microsoft SAT14?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates Microsoft SAT14?
Microsoft.
Data centers near San Antonio
- Microsoft SAT14 235 m · 18 MW
- CHRISTUS Health data center in Leon Valley 559 m · 8.9 MW
- Frost Bank data center in Leon Valley 687 m · 11 MW
- Lowe's Data Center 779 m · 11 MW
- CyrusOne San Antonio II 854 m · 19 MW
- Stream Data Centers - San Antonio II 971 m · 18 MW
- CyrusOne San Antonio 974 m · 4.7 MW
- Microsoft 1.1 km · 37 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.