Data Center Directory

CHRISTUS Health data center in Leon Valley

CHRISTUS Health data center in Leon Valley is an operational data center operated by CHRISTUS Health in Leon Valley, United States. Our footprint estimate of its power is about 8.9 MW.

Key facts

StatusOperational
OperatorCHRISTUS Health
Facility power8.9 MW (range 4.5 MW to 14 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 7,421 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates29.47033, -98.68619

Power and grid

Nearest high-voltage substationVerde Circle Substation, 138 kV, 600 m away (CPS Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationCagnon Road Substation, 345 kV, 6.8 km away
HV substations within 10 km17
UtilityCity Of San Antonio (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityERCO
Nearest gas pipelineEl Paso Texas Pipeline Co, intrastate pipeline, 4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km5.2 GW in 24 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature20.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.5 °C (2001 to 2025)
Cooling degree days1,804 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.84 kWh per m² per day
Wind at 50 m6.1 m/s average
Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CHRISTUS Health data center in Leon Valley use?

We estimate the facility power at about 8.9 MW. Estimate from building footprint, low confidence.

How close is CHRISTUS Health data center in Leon Valley to the power grid?

The nearest high-voltage substation in OpenStreetMap is Verde Circle Substation (138 kV), about 600 m away. The local utility is City Of San Antonio, in the ERCO balancing area.

How clean is the power for CHRISTUS Health data center in Leon Valley?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Who operates CHRISTUS Health data center in Leon Valley?

CHRISTUS Health.

Data centers near Leon Valley

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.