Vantage VA15
Vantage VA15 is an operational data center operated by Vantage Data Centers in Sterling, United States. Our footprint estimate of its power is about 3.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Vantage Data Centers |
| Facility power | 3.5 MW (range 1.8 MW to 5.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,943 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Vantage Data Plaza 45210, 20166, Sterling |
| Coordinates | 39.00071, -77.43666 |
Power and grid
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 1.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Vantage VA15 use?
We estimate the facility power at about 3.5 MW. Estimate from building footprint, low confidence.
How clean is the power for Vantage VA15?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Vantage VA15?
Vantage Data Centers.
Data centers near Sterling
- Sentinel Cloud Plaza 272 m · 37 MW
- Vantage VA13 412 m · 21 MW
- Vantage VA16 473 m · 6.7 MW
- STACK NVA01A 624 m · 22 MW
- Vantage VA2 635 m · 125 MW
- Amazon IAD-147 644 m · 19 MW
- VeriSign Incorporated 703 m · 23 MW
- PowerHouse Pacific Building 3 931 m · 14 MW
More Vantage Data Centers data centers
- Vantage TX1 United States
- Vantage VA2 United States
- Vantage Data Center FRA21 Germany
- Vantage VA3 United States
- Vantage VA13 United States
- Vantage San Antonio II United States
- Vantage Data Centers - CWL1 United Kingdom
- Vantage Data Centers AZ1 Campus United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.